COMPREHENSIVE BIBLIOGRAPHY OF EARNED VALUE LITERATURE
Last
updated:
04/13/2008
I update this bibliography regularly. If you know of any article related to Earned Value which is not in this list, please send the full citation to me and I will include it. You can get copies of most of these references via inter-library loans. Some of the references are in portable document format (PDF). Free software to read PDF files (Acrobat Reader) is available.
David
S. Christensen, Ph.D, CCEA, CMA
Chair, Department of Accounting
School of Business
Southern Utah University
351 West, University Blvd.
Cedar City, Utah 84720
Email: ChristensenD@suu.edu
|
|
Published papers:
Abba, Wayne (1986, November-December). "Cost/Schedule Control Systems Criteria White Paper." Program Manager 15:45-47.
Abba, Wayne (1989, November). "OverTarget Schedules." In Control2 :135139.
Abba, Wayne (1997, January-February). "Earned Value Management - Reconciling Government and Commercial Practices." Program Manager 26:58-63
Abba, Wayne (1990, December). "Unwritten Rules of Baseline Maintenance." In Control 3:346-350.
Abba, Wayne (1998, October). "Defense Acquisition Reform and Project Management." Proceedings, Project Management Institute.
Abba, Wayne (2001). "How Earned Value Got to Prime Time: A Short Look Back and Glance Ahead." The Measurable News.
Abba, Wayne (2003, February/March). "How Earned Value Got to Prime Time. PMForum.
Adamczyk, Walter F (1989). "EV Not Only for Large Projects." AACE Transactions, pp. J.2.1J.2.5.
Ahye, Catherine (1990). "Cost Schedule Control Systems Criteria (C/SCSC) Schedule Analysis." In Control 3:155165
Al-Jibouri, Saad (2003). "Monitoring Systems and their Effectiveness for Project Control in Construction." International Journal of Project Management 21:145-154.
Alvarado, Carlos M., Robert P. Silverman, and David S. Wilson (2004, June). “Assessing the Performance of Construction Projects: Implementing Earned Value Management at the General Services Administration.” Journal of Facilities Management 3/1: 92-105.
Amaral, Juan H (1989, September). Effect of Feedback on Cost Performance Report Utility. Masters Thesis, Air Force Institute of Technology (AU), WrightPatterson AFB, Ohio.
American National Standards Institute/Project Management Institute (2000). A Guide to the Project Management Body of Knowledge (PMBOK Guide). Newton Square, PA: American National Standards Institute.
Anbari, Frank T. (2003, December). “Earned Value Project Management Method and Extensions.” Project Management Journal 34.4: 12-23.
Anderson, Thomas D (1993, March). A Feasibility Analysis of Implementing C/SCSC Concepts at U.S. Army Depots. Masters Thesis. Monterey, California: Naval Post Graduate School.
Anthony, Robert N., John Dearden, and Vijay Govindarajan (1992). "Management Control of Projects." Chapter 17 of Management Control Systems,7th Edition. Homewood Illinois: Richard D. Irwin, Inc.
Antolini, R.C (1991, March). "For Contractors: Cost/Schedule Control Systems Training." In Control 3:1434.
Antolini, R.C (1992, April). "The Estimate at Completion Paradigm." In Control 5:179194.
Antvik, Sven (1998, October). "Earned Value Management (EVM) - A 200Year Perspective." Proceedings. Project Management Institute.
Antvik, Sven (2000, January). "Project Management in a Global Multi-project - On the use of Earned Value Management in the Swedish Gripen Project." International Research Network on Projects (IRNOP) Conference, Sydney, Australia.
Antvik, Sven and Elisabeth Ronnberg (2000, May 30). "Earned Value Management in Sweden - Policies and Project Examples." Project Management for a New Millennium Conference. Project Management Institute. Ottowa, Canada. 12 pages.
Antvik, Sven (2001, May). "Why was Earned Value Management Important to the Swedish Government in the Gripen Project?" Contract Performance Management Conference. Project Management Institute. San Diego, California.
Antvik, Sven (2001, September). "Why was Earned Value Management Important to the Swedish Government in the Gripen Project?" The Measurable News, pp. 1,18-19,21,25,28.
Antvik, Sven, Hans Hansson, Elisabeth Ronnberg, and Sven-Olof Wickzell (2001, September). "Earned Value Management in 10 Basic Steps." The Measurable News: 27-28.
Antvik, Sven (2001, December). "Is the "Schedule Variance" really a "Schedule Variance"? The Measurable News: 15.
Antvik, Sven (2002, October). "Earned Value Management in Sweden - Experiences and Examples." Proceedings of the Project Management Institute (October 3-10, San Antonio, Texas), 5 pages.
Arenaz, Mark R (1992). "DOEID C/SCSC Validation Program." In Control 5:125131.
Arnos, Jennie (2005, May). “Earned Value Professional Certification on Track for New Orleans Premier.” Cost Engineering 47:26-27.
Baber, Jim and L. Gentry (2007, April). "A Knowledge-based Approach to Program Analysis." American Society for the Advancement of Project Management (ASAPM) Online Magazine, pp. 1-11.
Bachman, David (2001). "Essay on an Alternative for Computing EACs for Mature BMDO Contracts." The Measurable News (2 pages).
Bachman, David (2001, March). "An Essay on the Selected BMDO Earned Value Estimate at Completion Equation." The Measurable News (2 pages).
Bachman, David (2001, Fall). "Single Point Adjustments: A New Definition With Examples." Acquisition Review Quarterly 8: 177-196.
Bahr, Walter E (2001, September-October). "Integrated Baseline Review." Program Manager:22-24
Baker, Bud (2003, September). "EVM: How Small Is Big Enough?" PM Network. p. 22.
Barraza, Gabriel A., Edward Black, and Fernando Mata. 2004. "Probabilistic Forecasting of Project Performance Using Stochastic S. Curves." Journal of Management Engineering 130/1 (Feb).
Barr, Zeev (1996, December). "Earned Value Analysis: A Cast Study." PM Network, pp. 31-37.
Basford, Jerry L (2001). "Earned Value Reporting in the Department of Energy." PhD dissertation. Minneapolis, Minnesota: Walden University.
Bates, Jennefer (1992). "U.S. Department of Energy - Benefits and Shortcomings of the Criteria Approach to Project Management." AACE Transactions. V2,pp. J.6.2.1-7.
Baumgartner, J. Stanley (1979). Systems Management. Washington DC: The Bureau of National Affairs, Inc.
Baumgartner, John H (1987, April). "Does Automation Remove the Need for Cost and Schedule Engineers?" In Control 1:7579.
Baumgartner, Stan (1987, April). "A Relatively Easy Leap to Effective Program Control." In Control 1:171181.
Beach, Chester Paul Jr (1990). A-12 Administrative Inquiry. Report to the Secretary of the Navy. Washington DC: Department of the Navy.
Bender, William John (2000, July). "A Risk-based cost control methodology for constructing complex structures with the mobile offshore base as a case study. Doctoral dissertation. University of Maryland College Park.
Bent, James A (1982). Applied Cost and Schedule Control. New York, NY: Marcel Dekker, Inc.
Beatty, John P (1998, October). "Earned Value for Professional Private Organizations." Proceedings. Project Management Institute.
Blanco, Vic D (2003, March-April). “Earned Value Management…A Predictive Analysis Tool.” Navy Supply Corps Newsletter 66.2: 24-27.
Block, Ellery B (1971, May-Jun). "Accomplishment/Cost: Better Project Control." Harvard Business Review.
Booker, Garry L., Nicholas Romano, and Deepa Ray (2005, September) “Technical Performance: The Primary Business Metric.” The Measured, PMI Metrics SIG Newsletter, Vol. 5, Issue 3, pp. 3-8.
Bower, D. C. (2004, October). Assured Value Analysis: Earned Value Extended. Paper presented at the PMI Global Congress North America 2004, Anaheim, CA, USA.
Bower, D. C. (2005, September). Phase Earned Value Analysis. Paper presented at the PMI Global Congress North America, Toronto, Canada.
Bowman, Thomas L (1989, November). "EAC Quality." In Control.
Bowman, Thomas L (1991). Interpretive Guide to the Evaluation /Demonstration Review Checklist for C/SCSC. AFIT.
Bowman, Thomas L (1993, March). "Estimating, Planning, and Budgeting for Contingency in the DOE Environment." In Control 6:3-13.
Bowman, Thomas L (1994, March). "DOE's Expanded PCS Guidelines (for Earned Value), A Case Example." In Control.
Brandon, Daniel M. Jr (1998, June). "Implementing Earned Value Easily and Effectively." Project Management Journal 29:11-18).
Brandon, Daniel M. (1998, June ) "Implementing Earned Value Easily and Effectively." Project Management Journal 29: 11-18.
Bredenkamp, J.M. and A.D. Milne (1988). "Construction Control - The Client's Prerogative." AACE Transactions, P.3.
Brimson, James A. and John Antos. 1999. "Performance Reporting and Analysis." Chapter 12, pp. 173-183. Driving Value Using Activity-Based Budgeting (John Wiley and Sons, Inc.)
Bromberg, Irwin (1984). "Earned Value Back to Basics." AACE Transactions, pp. A.6.1-.6.
Bromberg, Irwin (1984). "Earned Value Back to Basics." American Association of Cost Engineers, pp. a.6.1-a.6.6.
Bronn, John W (1987, April). "Using Line of Balance (LOB) to Effectively Measure Earned Value for Repetitive Manufacturing." In Control 1:6574.
Bronn, John W (1988, April). "Cost and Schedule Integration Useful Concept or Fantasy?" In Control 1:814.
Brown, John W (1985, August). "Evaluation of Projects Using Critical Path Analysis and Earned Value in Combination." Project Management Journal16 :59-63.
Buck, James G (1985). "Cost Control's Missing Link." AACE Transactions ,H.5.
Callaway, Edward A. (2004, January). “’Bring It Home’: Mitigate Performance Risk Through Ongoing Performance Monitoring.” Contract Management 44:60.
Canepari, John and M.J. Varrone (1986). "Application of a Manual Earned Value System for Small Engineering Projects." AACE Transactions,A.3.
Caseria, Tony (1991, Summer). "A Most Important Subject." The Measurable News, pp. 45.
Cass, Donald J (1991). "Earned Value Graphics New, Exciting, Innovative." AACE Transactions, pp. L.4.1L.4.6.
Cass, Donald J (1994). "Improve Schedule Forecasting via Earned Value." AACE Transactions, pp.CSC7.1-9.
Cass, Donald J (1998). "Earned Value Programs for DOE Projects." AACE International Transactions, pp. B10-B19.
Cass, Donald J (2000, February). "Earned Value Programs for US DOE Projects. Cost Engineering 42:24-37.
Caudron, Shari (1998, January). "Visionaries in Financial Reporting." Controller Magazine
Chang, Andrew Shing-Tao (2001, April). "Defining Cost Schedule Performance Indices and their Ranges for Design Purposes." Journal of Management Engineering 17/2.
Chen, Mark T (1991). "Applying Earned Value Procedure to Engineering Management." AACE Transactions, pp. O.4.1O.4.5.
Christle, Gary L (1981, Spring). "Automation of Program/Project Cost Reports Within DoD." National Estimator 1:22-27.
Christensen, David S (1989, Fall). "Management Control Systems Theory and C/SCSC." National Estimator, pp. 29-34.
Christensen, David S (1989, November-December). "Management Control Systems Theory is Useful Tool." Program Manager 18:2023.
Christensen, David S (1990, July-August). "The Role of Analysis in CSCSC" Program Manager 19:pp. 26-29+.
Christensen, David S (1991, March). "Responsible Analysis in C/SCSC." In Control 3:413.
Christensen, David S. and Terry V. Smith (1992, April). "An Evaluation of Cost/Schedule Performance Analysis Software." In Control, 5:288292.
Christensen, David S. and Kirk I. Payne (1992, April). "CPI Stability-Fact or Fiction?" Journal of Parametrics 10:27-40.
Christensen, David S., Richard C. Antolini, and John W. McKinney (1992, July). "A Review of Estimate at Completion Research." Cost Estimating and Analysis: Balancing Technology and Declining Budgets, pp. 207224.
Christensen, David S (1993, March). "The EAC Problem - A Review of 3 Studies." Project Management Journal 24: 37-42.
Christensen, David S (1993, Spring). Determining an Accurate Estimate at Completion National Contract Management Journal 25: 17-25.
Christensen, David S. and Scott Heise (1993, Spring). Cost Performance Index Stability National Contract Management Journal 25: 7-15.
Christensen, David S (1993, September). "An Analysis of Cost Overruns On Defense Contracts" Project Management Journal 24:43-48.
Christensen, David S (1994, Winter).
Cost Overrun
Optimism: Fact or Fiction? Acquisition Review Quarterly
1:
25-34.
Christensen, David S (1994, Spring). "Using Performance Indices to Evaluate the Estimate At Completion." Journal of Cost Analysis and Management, pp 17-24.
Christensen, David S (1994, September). "A Review of C/SCSC Literature." Project Management Journal 25:32-39.
Christensen, David S., Richard C. Antolini, and John W. McKinney (1995, Spring). A Review of EAC Research Journal of Cost Analysis and Management, pp. 41-62.
Christensen, David S. and Daniel Ferens (1995, Spring). Using Earned Value on Software Development Projects. Acquisition Review Quarterly 2: 155-171.
Christensen, David S and Daniel V. Ferens (1996, February). "Earned Value and Software Development." The Performance Management Bulletin, pp. 9-13.
Christensen, David S (1996, Spring). "Project Advocacy and the Estimate At Completion Problem." Journal of Cost Analysis and Management, pp. 35-60.
Christensen, David S and James Gordon (1998, September). Does a Rubber Baseline Guarantee Cost Overruns on Defense Acquisition Contracts? Project Management Journal 29:43-51.
Christensen, David (1998, Fall). The Costs and Benefits of the Earned Value Management Process Acquisition Review Quarterly 5: 373-386.
Christensen, David (1999, Summer). Using the Earned Value Cost Management Report to Evaluate the Contractor's Estimate At Completion. Acquisition Review Quarterly 19:283:296.
Christensen, David S., David Searle, and Caise Vickery (1999, Summer). The Impact of the Packard Commission's Recommendations on Reducing Cost Overruns on Defense Acquisition Contracts. Acquisition Review Quarterly 19: 251-262.
Christensen, David S. and Carl Templin (2000, June). An Analysis of Management Reserve Budget on Defense Acquisition Contracts Proceedings of the Society of Cost Estimating and Analysis (Manhattan Beach, CA).
Christensen, David S. and Carl Templin (2000, Summer). An Analysis of Management Reserve Budget on Defense Acquisition Contracts Acquisition Review Quarterly 23:191-208..
Christensen, David S. (2002, May). EAC Evaluation Rules: Do They Still Work? Cost Analysis Symposium, Air Force Institute of Technology, Wright-Patterson AFB, Ohio.
Christensen, David S. and Carl Templin (2002, Spring). EAC Evaluation Methods: Do They Still Work? Acquisition Review Quarterly 9:105-116.
Christensen, David S. and David Rees (2002, Winter). Is the Cumulative CPI-based EAC a Lower Bound to Final Cost on Post-A12 Contracts? Journal of Cost Analysis and Management, pp. 55-65.
Christensen, David S (2004. Winter). Is the Cumulative SCI-based EAC an Upper-Bound to Final Cost on Post-A12 Contracts? The Journal of Cost Analysis and Management, pp. 1-10.
Coleman, Richard L., Megan E. Dameron, Heather F. Chelson, Jessica R. Summerville, and Steven L. Van Drew (2003, June). "Predicting the Final CPI." Proceedings of the International Society of Parametric Analysts and the Society of Cost Estimating and Analysis. (Orlando, FL, 17-20 Jun 03).
Coutteau, Charles G. (1992, March). Cost and Schedule Control Management: What the Department of Defense Major Acquisition System Program Manager Needs to Know. Masters Thesis. Naval Postgraduate School.
Coutteau, Harlene N. (1992, March). What the DoD Non-Major PM Should Know About Cost & Schedule Management. Masters Thesis. Naval Postgraduate School.
Covach, John, Joseph J. Haydon, and Richard O. Reither (1981). A Study to Determine Indicators and Methods to Compute Estimate at Completion .Virginia: ManTech International Corporation.
Crean, William R. and Walter F. Adamczyk (1982). AACE Transactions, A.1.
Cressman, Kenneth R (1988, November). "The Performance Measurement System: An Overview of Aerospace Program Control." In Control 2:712.
Crowther, Steve. (1999, June). "Best of British: Earned Value Management." British Association for Project Management: 13.
Cukr, Anita (2001, March). "When is an Over Target Baseline (OTB) Necessary?" The Measurable News (3 pages).
Cukr, Anita (2001, March). "Research on Estimate At Completion Methodologies at the Ballistic Missile Defense Organization." The Measurable News (2 pages).
Culligan, Timothy M. and Crosby Mecham (1993). "Project Management as a Team Effort." AACE Transactions, D.1.
Cummings, Erik G. and Kirk A. Schneider (1992, September). Cost/Schedule Control Systems Criteria - A Reference Guide to C/SCSC Information. Masters Thesis. Air Force Institute of Technology (AU). Wright-Patterson AFB, Ohio.
De la Fuente, R. and E. Mazanares (1996). "A Production Control System based on Earned Value Concepts." Journal of Ship Production 12:153.
Delaney, Lawrence J (2000, January/February). "Embracing Earned Value Management for the21st Century." The Air Force Acquisition Reform Newsletter3/1 :1-2. There are several other articles related to earned value inthis newsletter: "An Introduction to Earned Value, For What It's Worth" (p. 3); "Earned Value Management Criteria" (p. 4). "The ABCs or EVM: Using Earned Value On Your Project" (p. 4-5).
Deng, Michael Z. M. and Y. F. Hung (December 1998). "Integrated Cost and Schedule Control: A Hong Kong Perspective." Project Management Journal 29:43-49.
Department of the Air Force (1989, September). Guide to Analysis of Contractor Cost Data. Wright-Patterson AFB, Ohio: Air Force Material Command.
Department of Defense (1978, 1 November). Cost/Schedule Management of Non-Major Contracts (C/SSR Joint Guide). Washington: Government Printing Office.
Department of Defense (1984, 1 October). C/SCSC Joint Surveillance Guide . Washington: Government Printing Office.
Department of the Defense (1987, 10 October). Cost/Schedule Control Systems Criteria: Joint Implementation Guide. Washington: Government Printing Office.
Department of Defense (1991, 23 February). Defense Acquisition Management Policies and Procedures. DOD Instruction 5000.2, Part 11, Section B. Washington: Government Printing Office.
Department of Defense (1991, 23 February). Defense Acquisition Management Documentation and Reports. DOD 5000.2M, Part 20. Washington: Government Printing Office.
Department of Defense and National Security Industrial Association (1991, 17 May). Joint DoD/Industry Total Quality Management Team Report for Program Management on the Cost/Schedule Control Systems Criteria.
Department of Defense (1993, 11 March). "Use of Contractor Cost and Schedule System Data." Audit Report 93-067.
Department of Defense (1993, 25 March). Work Breakdown Structures for Defense Material Items. Military Standard 881B. Washington: Government Printing Office.
Department of Defense (1998, 2 January). Handbook on Work Breakdown Structure. Military Handbook 881. Government Printing Office.
Diffenderfer, Hope A (1988, April). "Power and Potential of the Management Control System Description." In Control 1:47.
Dominic, Dominic (1990, November). "Understanding the C/SSR." Contract Management, pp. 8-11.
Draper, David L (1989a). "ACES A Wild Card in Beating Cost/Schedule Disintegration." AACE Transactions, pp. C.9.1C.9.2.
Draper, David L (1989b, June). "ACES A Wild Card in Beating Cost/Schedule Disintegration." In Control 2:9193.
Dukovich, John, Scott Houser, and David A. Lee (October 1999). "The Raleigh Analyzer." Volume 1 - Theory and Applications (AT902C1). Volume 2 - Users Manual (AT902C2). McLean, VA: Logistics Management Institute.
Duncan, William R (1987, April). "Estimate Variance: Charting the Rate of Change in 'Estimate At Completion.'" In Control 1:5564.
Dutton, Barbara (1988, December). "Managing Production with Flying Colors." Manufacturing Systems 6:2022.
Earley, Deborah S (1991, March). "The Five W's of Subcontractor Surveillances." In Control 3:294299.
Evensmo, Jan and Jan Terje Karlsen (2004) “Reviewing the Assumption Behind Performance Indexes.” Transactions of AACE International p CSC.07.1-7.
Faibisch, Irwin J (1991b, September-October). "Cost/Schedule Control Systems Criteria: It May be More than We Think." Program Manager20:3033.
Faibisch, Irwin J (1991a, Summer). "What Ever Happened to 'Technical Performance' in C/SCSC?" The Measurable News, pp. 810.
Faibisch, Irwin J (1992, April). "C/SCSC and the Program Manager or Why Program Managers Ought to Take a Closer Look at C/SCSC and Ask: What Is It and What It Can Do for Me." In Control 5:195203.
Farid, Foad and Saeed Karshenas (1988, November). "Cost/Schedule Control Systems Criteria Under Inflation." Project Management Journal 19:2329.
Ferraro, Mike (2003, November-December). “Technical Performance Measurement—A Program Manager’s Barometer.” Program Manager 31.6: 14-20.
Fleming, Quentin W. (1983). Put Earned Value Into Your Management Control System. Columbus, Ohio: Publishing Horizons,Inc.
Fleming, Quentin W. and Quentin J. Fleming. (1991). "Subcontract Project Management & Control: Progress Payments." Chapter 5 of Progress Payments and the Earned Value (C/SCSC) Concept. Chicago: Probus Publishing Company.
Fleming, Quentin W (1992). Cost/Schedule Control Systems Criteria: The Management Guide to C/SCSC. Chicago: Probus Publishing Company.
Fleming, Quentin W (1993, March). "Put Earned Value into your Scalable "Commercial" Management Control System." In Control 6:33-54.
Fleming, Quentin W (1993, Winter). "Department of Energy (DOE) Project Management Initiatives." Micro-Frame News VII:6-7.
Fleming, Quentin W (2003). Project Procurement Management- Contracting, Subcontracting, Teaming. Tustin, CA: FMC Press. ISBN # 0-9743912-0-4.
Fleming, Quentin W. and Joel M. Koppelman (1994, January). "The Essence of Evolution of Earned Value." Cost Engineering 36:21-27.
Fleming, Quentin W. and Joel M. Koppelman (1994, November). "The 'Earned Value' Concept: Back to the Basics." PMNETwork 8:27-29
Fleming, Quentin W. and Joel M. Koppelman (1994, June). "The 'Earned Value Cost Management Control Concept: Developing aLow-end Scalable Model." Internet `94, the 12th World Congress of the International Project Management Association. Oslo, Norway.
Fleming, Quentin W. and Joel M. Koppelman (1995). "Linking contractor payments to contractor performance." Transactions of the AACE International. Morgantown, pp. csmc21-24.
Fleming, Quentin W. and Joel M. Koppelman (1996). "Earned Value Project Management." Project. Association for Project Management. United Kingdom.
Fleming, Quentin W. and Joel M. Koppelman (1996). "Integrated Project Development Teams: Another Fad or a Permanent Change." International Journal of Project Management 14:163-168.
Fleming, Quentin W. and Joel M. Koppelman (1997, February). "The Genesis of Earned Value: The Factory Floor." Cost Engineering 39:13-15.
Fleming, Quentin W. and Joel M. Koppelman (1997). "Earned Value Project Management." Cost Engineering 39.
Fleming, Quentin W. and Joel M. Koppelman (1998, July). "Earned Value Project Management: A Powerful Tool For Software Projects." Crosstalk: The Journal of Defense Software Engineering, pp. 19-23.
Fleming, Quentin W. and Joel M. Koppelman (1998, June). "The Earned Value Project Management Body of Knowledge." Proceedings of the 14thWorld Congress on Project Management, pp. 793-798.
Fleming, Quentin W. and Joel M. Koppelman (1998, August 8). "Project Teams: The Role of the Project Office." Cost Engineering 40:33-36.
Fleming, Quentin W. and Joel M. Koppelman (1999, July). "Earned Value Project Management . . . An Introduction." Cross Talk - the Journal of Defense Software Engineering, pp. 10-14.
Fleming, Quentin W. and Joel M. Koppelman (1999, October 10-16). " The Earned Value Body of Knowledge. " Proceedings of the 30th Annual Project Management Institute.
Fleming, Quentin W. and Joel M. Koppelman (2000). Earned Value Project Management 2nd Edition. Upper Darby, PA: Project Management Institute.
Fleming, Quentin W. and Joel M. Koppelman (2001). "Earned Value Management: An Introduction." Chapter 10 of Project Management for Business Professionals. New York: John Wiley & Sons, Inc, pp. 166-178.
Fleming, Quentin W. and Joel M. Koppelman (2001, May). "Earned Value for the Masses: A Practical Approach." PM Network.
Fleming, Quentin W. and Joel M. Koppelman (2001, December). "Earned Value for the Masses" The Measurable News p. 24-26
Fleming, Quentin W. and Joel M. Koppelman (2002, January). "Earned Value Project Management: A Powerful Tool For Software Projects." Projects & Profit II: 54-59.
Fleming, Quentin W. and Joel M. Koppelman (2002, March-April). "Earned Value Management: Mitigating the Risks Associated with Construction Projects." Program Manager: 90-95.
Fleming, Quentin W. and Joel M. Koppelman (2002 March). “Earned Value Management.” Program Manager 31:90-95.
Fleming, Quentin W. and Joel M. Koppelman (2002, June). "The Curse of Earned Value Management: Level of Effort - Always Quantify and Quarantine LOE" The Measurable News: 16-19.
Fleming, Quentin W. and Joel M. Koppelman (2002, September). "Earned Value Management." Cost Engineering 44:32-36.
Fleming, Quentin W. (2003, July/August). "One On One: The Case for Earned Value." Projects @ Work.(3 pages).
Fleming, Quentin W. and Joel M. Koppelman (2003, September). "What's Your Project's Real Price Tag?" Harvard Business Review, pp. 20-22.
Fleming, Quentin W. and Joel M. Koppelman (2004, April). "Sarbanes-Oxley: Does Compliance Require Earned Value Management on Projects?" Contract Management, pp. 26-28.
Fleming, Quentin W. and Joel M. Koppelman (2004, Spring). If EVM is so Good, Why Isn't it used on all Projects? The Measurable News, 5 pages.
Fleming, Quentin W. and Joel M. Koppelman (2005). Earned Value Project Management, 3rd edition. Newton Square, PA: Project Management Institute (PMI). ISBN 1-93069989-1.
Fleming, Quentin W. and Joel M. Koppelman (2006, June). "Start with 'Simple' Earned Value... on All of Your Projects." CrossTalk The Journal of Defense Software Engineering: 20-23.
Fleming, Quentin W. and Joel M. Koppelman (2008, March). "If It Walks and Talks Like EVM it Must be Earned Value Management. Contract Management: 46-53.
Fordham, Gregory L (1988, September). "The Gleam and Glitter of Cost Reimbursable Government Contracts." CPA Journal 58:8083.
Fox, J. Ronald (1971, May-June). "Funds Control versus Cost Control." Army Logistician, pp. 4-7, 38-39.
Fronefield, Valerie A (2000, June). "Control of the System: Real World Experiences Using C/SCSC." Proceedings of the Society of Cost Estimating and Analysis (Las Angeles, CA).
Gadeken, Owen C. and Thomas S. Tison (1983, July-August). "The Cost of C/SCSC." Program Manager 12:13-18.
Gage, P.R. and G. A. Sponder (1987, January). "Improved Cost Control Through the Application of the Personal Computer." In Control 1:310.
Gallagher, Mark A. and David A. Lee (1996). "Final Costs Estimates for Research & Development Programs Conditioned on Realized Costs." Military Operations Research 2:51-65.
Garden, Gary W. II, and Robert C. Creese (2000)."Cash Flow Analysis in Construction Projects." AACE International Transactions, RISK.02.
Gardiner, Kenneth S. 2000. "Revisiting the Golden Triangle of Cost, Time, and Quality: the Role of NPV in Project Control, Success, and Failure." International Journal of Project Management 18:251-256.
General Accounting Office (1997, May). "Significant Changes Underway in DOD's Earned Value Management Process." GAO/NSIAD-97-108.
Gildea, Dan. (1998, October). "Transitioning from Trust to Understanding: Introduction of Project Management Initiatives into a Legacy Program." Proceedings. Project Management Institute.
Gillam, Dale E. (2005, Spring). “Evaluating Program Management and Earned Value Management Systems (EVMS) Using OMB’s Program Assessment Rating Tool (PART).” The Measurable News: 1.
Gillam, Dale E. (2006, Winter). “Improving the Discipline of Program Management.” The Measurable News: 5.
Goodpasture, John (2000, January). "Everything You Wanted to Know About Time-Centric Earned Value." PM Network 14:51-54.
Gosier, Chris, and Adam Stone (2005, April). “OMB Changes IT Rules.” Federal Times 41:1-6.
Graham, David R (1987, April). "C/SCSC Schedule Variance: Focus on Dollars." In Control 1:46.
Graham, David R (1988, August). "Reward for Earned Value." In Control 2:1114.
Green, Don (1998, October). "Project Control Through Earned Value." Proceedings. Project Management Institute.
Greenbaum, Joseph and Michael E. Kuca (1993). "Light Truck Energy Management Program." AACE Transactions, J5.
Grskovich, Donald L (1990, Winter). "What is C/SCSC? In English, Please!" National Contract Management Journal 23:2532.
Harroun, William P., Jeffrey S. McCarthy, and Dan D. Epperson (1993,October). "Importance of Scope Management." Proceedings of the 5th Annual Cost Schedule Performance Management Conference, Washington, D.C.
Hardin, Wayne C. and Barton J. Roth (1968, August). "An Analysis of the Development, Need, and Theory of the Air Force Cost/Schedule Planning and Control Specification." Masters thesis. Air Force Institute of Technology. Wright Patterson Air Force Base, Ohio.
Hatfield, Michael (Dec 96). "The Case for Earned Value." PM Network ,p. 25.
Hatfield, Michael and Alice Skehan (Nov 97). "The Top 10 Ways to Game the C/SCSC System, Part 1." PM Network, p. 72.
Hatfield, Michael and Alice Skehan (Dec 97). "The Top 10 Ways to Game the C/SCSC System, Part 2." PM Network, p. 72.
Hatfield, Michael (Sep 99). "Improving Project Performance Through Staff Abuse." The Measurable News, p. 7.
Hatfield, Michael (2005, July). “You Have To?” PM Network 19:72.
Haugan, Gregory T (2003). The Work Breakdown Structure in Government Contracting. Vienna, VA: Management Concepts.
Hays, Ram J (1987, April). "Use of C/SCSC Data in the Factory." In Control 1:80101.
Hayes, Heather (2002, February). “Using Earned-Value Analysis to Better Manage Projects.” Pharmaceutical Technology 26.2: 80-84.
Hegazy, Tarek and Kevin Petzold (2003, August). “Genetic Optimization for Dynamic Project Control.” Journal of Construction Engineering & Management 129.4: 396-404.
Heck, Michael (1989, 25 September). "Product Comparison Mission: Made Possible." InfoWorld 11:5776.
Hemphill, Ron and Mary K. Fleming (1987, Summer). "Cost/Schedule Management: An Earned Value Approach." Armed Forces Comptroller, pp. 26-30.
Henderson, Kym. (2003, Summer). "Earned Schedule: A Breakthrough Extension to Earned Value Theory? - A Retrospective Analysis of Real Project Data." The Measurable News, pp.13-23.
Henderson, Kym. (2004, Spring). “Further Developments in Earned Schedule.” The Measurable News, pp.15-22.
Henderson, Kym. (2005, 23 February). “The Benefits of Earned Value Management for “'Strategic Commercial Imperatives' ” Proceedings of the inaugural PMI Asia‑Pacific Global Congress Singapore: 21 – 23.
Henderson, Kym. (2005, Spring) “Earned Schedule in Action”. The Measurable News, pp.23-30.
Henderson, Kym and O. Zwikael. (2008, April). "Does Project Performance Exist? A Re-examination of CPI and Evaluation of SPI (t) stability." CrossTalk - The Journal of Defense Software Engineering 21:7-13.
Hildreth, Don (1989, June). "Performance Measurement of FFP Major Subcontracts." In Control 2:9698+.
Hill, William J (1991, Summer). "Toward More Effective Management and Control of Contractor Payments." The Measurable News pp. 68.
Holbrook, Mark A., Michael A. Greiner, and David S. Christensen. (2003, June). "An Analysis of the Implementation of Acquisition Reform Initiatives and Cost Cost Variance." Proceedings of the International Society of Parametric Analysts and the Society of Cost Estimating and Analysis. (Orlando, FL, 17-20 Jun 03).
Horan, Ron and Don McNichols (1990, September). "Project Management for Large Scale Systems." Business Communications Review 20:1924.
Horngren, Charles T. and George Foster (1991). Cost Accounting: A Managerial Emphasis. Seventh Edition. Englewood Cliffs, NJ: Prentice Hall, Inc.
Howes, Rodney (2000, December). “Improving the Performance of Earned Value Analysis as a Construction Project Management Tool.” Engineering Construction & Architectural Management 7.4: 399-411.
Howrwitz, Michael E (1986). "Progress Measurement in Engineering and Construction." Transactions of the American Association of Cost Engineers, pp. a.4.1-a.4.6.
Houser, Joseph R. and Kenneth A. Potocki (1993, September-October). "DoD Contract Performance Management and TQM." Program Manager 22:16-21.
Howard, Truman W. and Harold R. Bright (1982, Spring).Automated Contractor Performance Measurement System: A Useful Tool of the U.S. Army MissileCommand." National Estimator 3:27-32.
Humphreys & Associates, Inc (2002). Project Management Using Earned Value.
Humphreys & Associates, Inc (2002). Pocket Guide to Planning and Managing in a Performance Measurement System.
Humphreys, Gary C (2001, September). "Assessing the Impact of Front-loading on the CPI and EAC." The Measurable News, 4 pages.
Huot, Jean-Claude (1981). "Productivity Defined." AACE Transactions I.4.
Ince, D.C (January 1994). "ISO9000-3 and Software Measurement." British Telecom Technology Journal 12:109-117.
Jaafari, A. (1996, October). "Time and Priority Allocation Scheduling Techniques for Projects." International Journal of Project Management14:289-299.
Jacob, D.S. 2003, March). "Forecasting Project Schedule Completion With Earned Value Metrics." The Measurable News: p. 1,7-9.
Jenison, W.D., M.W. Robbins (1998, October). "Earned Value Management at Government Facilities." Proceedings. Project Management Institute.
Judd, Michael G (1990, October). "Improving Cost/Schedule Management: A Case Study in Implementing TQM." The Measurable News.
Judd, Michael G (1991, February). "Improving Cost and Schedule Management." National Defense Journal.
Judd, Michael G (1991, Summer). "Shooting the Cultists." The Measurable News.
Kagan, Stanly S (1987). "Material Applied Costs Under C/SCSC Maybe There's a Better Way for Cost Visibility." In Control 1:3943.
Kagan, Stanly S (1989, April). "C/SCSC Is There a Mission Criterion?" In Control 2:4552.
Karaa, Fadi A. and Badi Abdallah (1991, September). "Coordination Mechanisms During the Construction Project Life Cycle." Project Management Journal 22:4553.
Kauffmann, Paul, Charles Keating, and Carol Considine. (2002, March). "Using Earned Value Methods to Substantiate Change-of-Scope Claims." Engineering Management Journal 14:13-20.
Kemps, Robert R (1971, Summer). "Contractor Performance Measurement." Defense Industry Bulletin.
Kemps, Robert R (1973, February). Comments to Editor. National Contractor Management Journal.
Kemps, Robert R (1990, Fall). "Solving the Baseline Dilemma." The Measurable News pp. 1+. Kemps, Robert R (1992, Spring). "The C/SSR Conundrum." The Measurable News 1+.
Kemps, Robert R (2000). Fundamentals of Project Performance Measurement. Humphreys & Associates, Inc.
Kerzner, Harold (1989). "Cost Control." Chapter 15 of Project Management: A Systems Approach to Planning, Scheduling and Controlling. New York, NY: Van Nostrand Reinhold Company, Inc.
Kim, EunHong (2000). "A Study on the Effective Implementation of Earned Value Management Methodology." Doctoral dissertation. The George Washington University.
Kim, Yong-Woo and Glenn Ballard (2002 March). “Earned Value Method and Customer Earned Value.” Journal of Construction Research 3:55-66.
Kim, EunHong, William G. Wells Jr., and Michael R. Duffey (2003, July). “A Model for Effective Implementation of Earned Value Management Methodology.” International Journal of Project Management 21.5: 375-382.
Knepp, Richard E. and Michael E. Stroble (1993, September). Development of Standardized S Curves for the Evaluation of Major Department of Defense Purchases. Masters Thesis. Air Force Institute of Technology.
Koval, John G (1981). "System for Establishing Drawing Status." AACE Transactions. A.2.
Kumar, Parmanand (1979). "Project Control Through Performance Measurement System." AACE Transactions, A.2.
Kunz, Gerald R (1988, January). "Project Controls: Management's Decision Making Tool." Cost Engineering 30:1622.
Lambert, Lee R (1988). "Cost/Schedule Control System Criteria: A Lighthearted Introduction for the NonBeliever." AACE Transactions, pp. D.11.1D.11.5.
Lambert, Lee R (1989). "Understanding the Value of Earned Value or Where Have All Your Dollars Gone?" AACE Transactions, pp. H.2.1H.2.4.
Lambert, Lee R and Erin Lambert (2000). Project Management: The Common Sense Approach. Columbus, Ohio: LCG Publishing.
Land, Thomas J. and Edward L. Preston (1980, June). A Comparative Analysis of Two Cost Performance Forecasting Models. Masters Thesis. Air Force Institute of Technology.
Langford, H. W. and T. M. McCann (1983, April). "Effective Planning and Control of Large Projects - Using Work Breakdown Structure." Long Range Planning 16:38-50.
Laurent, Anne. (1997, May) "Cover your Assets." Government Executive 9:16:22.
Lee, David A., Michael R. Hogue, and Mark A. Gallagher (1997, Fall). "Determining a Budget Profile from a R&D Cost Estimate." Journal of Cost Analysis, pp. 29-42.
Lee, David A, J. A. Dukovich (1997). "Using the Raleigh Analyzer. "Report AT701C1. McLean, VA: Logistics Management Institute.
Lee, David (2002, March). "Norden-Raleigh Analysis: A Useful Tool for EVM in Development Projects." The Measurable News.
Levine, Harvey A (1988, October). "Project Management: Working Toward Cost, Resource Management." Software Magazine 8:7487.
Lewis, James P (1993, July). "Project Management: Think Like Your Customers." Transportation& Distribution 34:26-28.
Lipke, Walter H (1999, March). "Applying Management Reserve to Software Project Management." Cross Talk - The Journal of Defense Software Engineering, pp. 17-21. Reprinted in Projects and Profits (2002, March):19-26.
Lipke, Walter H (2000, May). "Statistical Process Control Meets Earned Value." Cross Talk- The Journal of Defense Software Engineering 13:16-20.
Lipke, Walter H and Jeff Vaughn (2000, June). "Statistical Process Control Meets Earned Value." Proceedings of the National Society of Cost Estimating and Analysis (Las Angeles, CA).
Lipke, Walter H and Mike Jennings (2000, December). "Software Project Planning, Statistics, and Earned Value." Cross Talk- The Journal of Defense Software Engineering13:10-14.
Lipke, Walter H (2001, March). "Project Recovery . . . It Can Be Done." The Measurable News (5 pages).
Lipke, Walter H (2002, January). "Project Recovery . . . It Can Be Done." Cross Talk 15:26-29.
Lipke, Walter H. (2002, September). "Statistical Process Control of Project Performance." The Measurable News.
Lipke, Walter H (2002, November). EVM and Software Project Management - Our Story CrossTalk -The Journal of Defense Software Engineering15: 30 ( 6 pages).
Lipke, Walter H (2002, December). "A Study of the Normality of Earned Value Management Indicators." The Measurable News. Page 1.
Lipke, Walter H (2003, Summer). "Schedule is Different." The Measurable News.
Lipke, Walter H. (2003, Summer). "Deciding to Act." The Measurable News, pp. 1, 9-13.
Lipke, Walter H. (2003, December). "Deciding to Act." Cross Talk, pp. 21-24.
Lipke, Walter H (2003, November). "The Probability of Success." CrossTalk - the Journal of Defense Software Engineering, 11 pages.
Lipke, Walter H. (2003, Fall/Winter). "Achieving Normality for Cost." The Measurable News, pp. 1, 6-11.
Lipke, Walter H. (2004, Spring). "Independent Estimates At Completion -Another Method." The Measurable News, pp. 10-14.
Lipke, Walter H. (2004, January). "The Probability of Success." The Journal of the Quality Assurance Institute, pp. 14-21
Lipke, Walter H. (2004, October). "Independent Estimates at Completion - Another Method." CrossTalk - the Journal of Defense Software Engineering 17:26-30.
Lipke, Walter H. (2004, Winter). "Connecting Earned Value to the Schedule." The Measurable News, pp. 1,6-16 and Cross Talk, the Journal of Defense Software Engineering (Jun 2005).
Lipke, Walter H. (2005, Summer). "A Re-Examination of Project Outcome Prediction ...Using Earned Value Management Methods." The Measurable News, pp. 14 - 26.
Lipke, Walter H. (2005, June). "Independent Estimate at Completion - Another Method." Proceedings of the Society of Cost Estimating and Analysis, pp. 196-206.
Lipke, Walter H. (2006, Winter). "Statistical Methods applied to EVM ...the Next Frontier." The Measurable News, pp 18-30.
Lipke, Walter H. (2006, June). "Statistical Methods Applied to EVM: The Next Frontier." CrossTalk, the Journal of Defense Software Engineering, pp 20-23.
Lipke, Walter H. (2006, September). "Earned Schedule Leads to Improved Forecasting." Proceedings of the 3rd International Conference on Project Management (PROMAC 2006).
Lipke, Walter H. (2006, September). "Statistical Methods Applied to Project Management." Proceedings of the 3rd International Conference on Project Management (PROMAC 2006).
Lipke, Walter H. and Kym Henderson (2006, November). "Earned Schedule: An Emerging Enhancement to Earned Value Management." CrossTalk - The Journal of Defense Software Engineering 19: 26-30
Lipke, Walter H. (2006, Fall). "Applying Earned Schedule to Critical Path Analysis and More." The Measurable News, pp 26-30.
Lipke, Walter H. and Kym Henderson (2006, November). "Earned Schedule - a Quantum Advance," Association for Project Management Yearbook 2006/07, pp 64-66.
Lipke, Walter H. and Kym Henderson (2007, February). "Earned Schedule An Emerging Enhancement to EVM" Projects & Profits, pp 67-75.
Lipke, Walt (2007, October). "Applying Earned Value and Earned Schedule to Project Management," Projects & Profits, pp 27-32.
Lipke, Walt. (2008, April). "Schedule Adherence: A Useful Measure for Project Management." CrossTalk - The Journal of Defense Software Engineering 21:14-18.
Little, Arthur D., Inc (1983 and 1984). Survey Relating to the Implementation of Cost/Schedule Control Systems Criteria Within the Department of Defense and Industry, Phases I and II. A report for the Assistant Secretary of Defense.
Lovette, Richard J. and Burt Roth (1970, Winter). "Monitoring the Contractor's Planning and Control Systems - C/SPCS." Logistics Spectrum 4:27-32.
Lowerre, Wm. M. Jr. (2003, Summer). "A Technical Assessment of Several Linear Forecasting Models and Their Relative Optimism." The Measurable News, pp. 26-30.
Maciariello, Joseph A (1978). Project Management Control Systems .New York: Ronald Press.
Mahler, Fred and Mark Mazina (1980). "Implementing Earned Value Reporting." AACE Transactions, pp. A.8.1-4.
Mahler, Fred and Mark Mazina (1982, February). "Earned Value Reporting Earns Its Keep." Cost Engineering 24:13-17.
Mansuy, John (1991, December). "Work Breakdown Structure: A Simple Tool for Complex Jobs." Cost Engineering Vol. 33, No. 12.
Manzer, Fred (2001, September). "Critical Chain As A Management Technique." The Measurable News, 2 pages.
Marchionna, Frederick H (1992, April). "Performance Measurement is Not Program Management." In Control 5:214222.
Marrella, Leonard S. (1973, February). "The Effect of the Cost and Schedule Systems Criteria on Contractor Planning and Control." Doctoral Dissertation. The George Washington University. (Available from the Defense Technical Information Center, AD-774-067).
Marrella, Leonard S (1975). "C/SCSC Implementation - Lessons Learned." Study Project Report. Fort Belvoir, VA: Defense Systems Management School.
Marshall, Robert A (2005, October). "The Case for Earned Value Management with Fixed-Price Contracts." Contract Management, pp. 30-34.
Marshall, Robert A (2006, October). "The contribution of earned value management to project success on contracted efforts: A quantitative statistics approach within the population of experienced practitioners." IRNOP VII (October 11-13, Xian, China): 739-751.
Marshall, Robert A. (Editor, 2nd Ed.). (2007). Professional Practice Guide to Earned Value. Association for the Advancement of Cost Engineering International. AACE: Morgantown, WV.
Marshall, Robert A. (2007). "The Principles of Earned Value Management as Predictor Variables of Project Success." Transactions of the 51st Annual International Conference of the Association for the Advancement of Cost Engineering (AACE). Morgantown, WV.
Marshall, Robert A. (2007, September). "The contribution of earned value management to project success on contracted efforts: A quantitative statistics approach within the population of experienced practitioners." Journal of Contract Management.
Marshall, Robert A., Philippe Ruiz, and Christophe N. Bredillet (2008, Aprril). "Earned Value Management Insights Using Inferential Statistics." International Journal of Managing Projects in Business 1(2):288-294.
Martin, Laura (2000, January/February). "EVIPT Breathes New Life Into Earned Value Management." The Air Force Acquisition Reform Newsletter3/1: 6.
Mast, Patricia A (1987, January). "Pulling It All Together." In Control 1:19+.
Maust, Gregory E (1991, March). "The State of Artificial Intelligence in CPR Analysis." In Control 3:3546.
McKinney, John W (1991, September). Estimate At Completion Research A Review and Evaluation. Masters Thesis, Air Force Institute of Technology, WrightPatterson AFB, Ohio.
Miller, George J. and Leah C. Loyd (1991, March). "The Marriage of Manufacturing Resource Planning (MRPII) and Performance Measurement Systems." In Control 3:153162.
Mill, Pete. June 1999. "The Development of a Company Earned Value Management System." Project (UK).
Mukho, S. and J. Lisanti (1982). "Application of Earned Value for Small Project Control: Panacea or Bane." AACE Transactions, A.1.
Nasr, Elhami B., James Diekmann, an John A. Kuprenas (2000). "Total Project Cost Success Factors" (2000). AACE International Transactions CSC.09.
National Research Council (1999). "Improving Project Management in the Department of Energy." National Academy Press.
National Security Industrial Association (1980, October). Cost/Schedule Systems Compendium. Washington, DC: National Security Industrial Association.
Neil, James M (1987). "Progress and Cost Control Basics." AACE Transactions ,S.8.
Neil, James M (1989). "Project Control for Engineering." AACE Transactions ,S.7, pp. 49-59.
Nevins, Daniel P., Ronald J. Zabilski, and Bridget E. O'Reilly (1993). "Integrated Network Planning and Scheduling with 3D Construction Models." AACE Transactions C.10.
Nguyen, Nghi M (1988). "CS2 in High Tech Program Management." AACE Transactions, pp. U.1.1U.1.10.
Nguyen, Nghi M (1989). "Cases Impairing C/SCSC Application in Program Management." AACE Transactions, pp. E.2.1E.2.11.
Nguyen, Nghi M (1991). "Effective Subcontractor Management in High Tech Projects." AACE Transactions, pp. D.1.1D.1.7.
Nichols, John M (1990). "Project Control." Chapter 15 of Managing Business and Engineering Projects. Englewood Cliffs, NJ: Prentice Hall.
Niemann, William J (1982, May-June). "If the Pharaoh had Only Used an Earned Value System in Building the Pyramids." Program Manager 11:15.
Obradovitch, M. M. and S. E. Stephanou (1990). Project Management: Risks and Productivity. Bend OR: Daniel Spencer Publishers.
Odum, Richard F., L. Carrier, N. Babich, B. Hunt, R. LePoint, and J.Shedd. (1998, October). "Program Management Process on F/A-18E/F- New Directions." Proceedings. Project Management Institute.
O'Reilly, Patrick and Kenneth Brown (1997, January-February). "A PM's Perspective on Cost Control: The Army-Industry PAC-3 Experience." Army Research, Development, and Acquisition
Ostdiek, Marion A. and Richard T. Estes (1975, August). Cost Schedule Control System Criteria: An Analysis of Managerial Utility. MS Thesis. Air Force Institute of Technology, WrightPatterson AFB, Ohio.
Pakiz, John J (1991, March). "NASA Space Station The Ultimate PMS Challenge." In Control 3:97110.
Payne, Kirk I (1990, September). An Investigation of the Stability of the Cost Performance Index. MS Thesis, Air Force Institute of Technology, WrightPatterson AFB, Ohio.
Patton, Nanette and Allan Shechet. (2007, January). "Earned Value Management: Are Expectations Too High?" CrossTalk The Journal of Defense Software Engineering 20/1: 10-15.
Pavyer, Eric (2002, March). "Controlling Project Costs with Earned Value Management." Management Services, pp. 24-25.
Peck, Ron K (1991, Summer). "Performance Indices Their Use and Misuse." The Measurable News, pp. 1+.
Peeler, David L. (2003, June). "Autopsy of an Overrun: An Earned Value Management Perspective." Proceedings of the International Society of Parametric Analysts and the Society of Cost Estimating and Analysis. (Orlando, FL, 17-20 Jun 03).
Peter, James J (1993, March). "Utilizing Augustine's Laws to Compute Worst-Case Correction Factors for Cost/Schedule Estimates at Completion." In Control 6:85-90.
Petro, Tom and Ken Milani (Summer 2000). "Northrop Grumman's Four-Tier Approach to Earning Value." Management Accounting Quarterly1/4:40-48.
Peterson, Jan C. and Carl J. Rehling, Jr (1993, March). "Trident II: The Cult of Success." In Control 6:91-102.
Pham, T.G (1985, March). "The Elusive Budgeted Cost of Work Performed for Research and Development Projects." Project Management Quarterly, pp. 76-79.
Postula, Frank D (1991). "WBS Criteria for Effective Project Control." AACE Transactions, I.6.
Powell, Sandra S (1992, April). "Standards for Analysis of CPR/CSSR from the Customer Perspective." In Control 5:165178.
Pracchia, Lisa (2004, January). "The AV-8B Team Learns Synergy of EVM and TSP Accelerates Software Process Improvement." CrossTalk-The Journal of Defense Software Engineering 17:20-22.
Presutti, Anthony H (1993, Spring). "Cost/Schedule Control Systems Criteria: A Government Process That May Work." Government Accountant's Journal, pp. 47-54.
Project Management Institute. 1996. A Guide to the Project Management Body of Knowledge (PMBOK Guide). Newton Square, PA: PMI.
Project Management Institute Staff (2004). Practice Standard for Earned Value Management. Newtown Square, Pennsylvania: Project Management Institute.
Price, James B (1985, September). An Evaluation of CPRA Estimate at Completion Techniques Based Upon AFWAL Cost/Schedule Control System Criteria Data. Masters Thesis. Air Force Institute of Technology, WrightPatterson AFB, Ohio.
Pryor, Stephen (1988, June). "Project Control 2: Measuring, Analyzing and Reporting." Management Accounting (UK) 66:1819.
Pugh, James E (1985, September). Evaluation of Procedures Employed During Source Selection for Contracts Including Clauses Requiring Cost/Schedule Control Systems Criteria (C/SCSC). Masters Thesis, Air Force Institute of Technology, WrightPatterson AFB, Ohio.
Raz, Tzvi and Shlomo Globerson (December 1998). "Effective Sizing and Content Definition of Work Packages." Project Management Journal 29:17-23.
Raz, Tzvi and Dan Elnathan (February 1999). "Activity-based Costing for Projects." International Journal of Project Management 17:61-67.
Reeves, Jerry and Joseph Maddock (1988, January-February). "Production Management: Integrating Cost Performance with Line of Balance." Program Manager, pp. 17:2933.
Reuter, Robert and Anthony Webster (1989, November). "Contractor Self Governance: A Concept Who's Time has Now Arrived." In Control 2:221224.
Robb, Karen (2004, January). “Set Goals, Track Progress To Rein In contract Costs.” Federal Times 39:14-16.
Robinson, Paul B. (1997, June). "The Performance Measurement Baseline- A Statistical View. Project Management Journal 28: 47-32.
Rogers, Melvin F (1979). "Cost/Performance Measurement." AACE Transactions ,D.8.
Roman, Daniel D (1986). Managing Projects: A Systems Approach. New York NY: Elsevier Science Publishing Co., Inc.
Ruskin, Arnold M (1995, September). "Measuring Project Performance: Acceptably Small Inch-pebbles." Engineering Management Journal 7:5-10.
Ruskin, Arnold (2004, September). “Two Issues concerning the Use of Earned Value Measurements.” Engineering Management Journal 16:26-30.
Rozenes, Shai., Gad Vitner, and Stuart Spraggett. 2004. MPSC: Multi-dimensional Project Control System." International Journal of Project Management 22:109-118.
Seay, Douglas C (1991, November-December). "Contracting for Cost Control." Program Manager 20:18-21.
Scholz, William H (1988, April). "Communication of Performance Results: Pictures and Numbers." In Control 1:1521.
Schulte, Ruthanne (2001). "What is the Health of my Project? The Use and Benefits of Earned Value" White Paper Library, Welcom.
Schulte, Ruthanne (2001). "Modern Cost Management" White Paper Library, Welcom.
Short, Jim W (1993, October). "Using Schedule Variance as the Only Measure of Schedule Performance." Cost Engineering, Vol 35, No. 10.
Shtub, Avraham (1992, January). "Evaluation of Two Schedule Control Techniques for the Development and Implementation of New Technologies: A Simulation Study." R&D Management 22:81-87.
Silvestrini, Remo J (1987). "Project Planning." AACE Transactions ,S.7.
Singh, Amarjit (1991, June). "Knowledge Bases for C/SCSC." Cost Engineering 33:3949.
Singh, Amarjit (1993). "Non-linear Earned Value Analysis." AACE Transactions .C-16.1-6
Singh, Amarjit (1997, Fall). "An Investigation and Analysis of Non-linear Project Cost Forecasting in Earned Value Analysis Using the Beta Family of Equations. Journal of Cost Analysis, pp.57-88.
Singh, Rohit (1991). "Cost/Schedule Control vs Computer Programs." AACE Transactions, pp. C.3.1c.3.3.
Slemaker, Chuck M (1985). The Principles and Practice of Cost/Schedule Control Systems. Princeton: Petrocelli Books.
Smith, Aaron (2002). On Target Projects at Work (November). 5 pages.
Smith, Larry A (1988, April). "Mainframe ARTEMIS: More than a Project Management Tool Earned Value Analysis (PEVA)." Project Management Journal 19:2328.
Smith, Larry W. and A. Todd Steadman (April 1999). "Gaining Confidence in Using Return on Investment and Earned Value." Cross Talk.
Smith, Terry V (1990, September). CPR Software Analysis: Determining "The Ideal" Software. Masters Thesis. Air Force Institute of Technology, WrightPatterson AFB, Ohio.
Snell, Lyn and Bob Wacker (1988, August). "How to Structure a Proposal Around Your Cost/Schedule Control System." In Control 2:1522.
Solomon, Paul (2002, October). Using CMMI to Improve Earned Value Management. Technical Note CMU/SEI-20020TN-016. Pittsburgh, PA: Software Engineering Institute, Carnegie Mellon University.
Solomon, Paul (2002, March). "From Performance-based Earned Value to CMMI." The Measurable News, pp. 1, 9-10, 17-20.
Solomon, Paul (2002, September)."Going from Performance Based Earned Value to CMMI" CrossTalk The Journal of Defense Software Engineering 16:32.
Solomon, Paul (2001, September). "Practical Software Measurement, Performance-Based Earned Value." Cross Talk, The Journal of Defense Software Engineering 14:25-29.
Solomon, Paul (2004, May-June). "Integrating Systems Engineering With Earned Value Management." Defense AT&L: 42-46.
Solomon, Paul (2005 August). "Performance Based Earned Value." Cross Talk 18:22-26.
Solomon, Paul (2006, May). "Practical Performance-Based Earned Value." Cross Talk: 20-24.
Solomon, Paul and Ralph Young (2007). Performance-Based Earned Value. Hoboken NJ: John Wiley & Sons. ISBN 0-471-72188-3.
Staley, Mary J., Patricia Oberndorf, and Carol A. Sledge (2002, June). Using EVMS with COTS-Based Systems Technical Report CMU/SEI-2002-TR-022. Pittsburgh, PA: Software Engineering Institute, Carnegie Mellon University.
Straight, Ronald, Rebecca Lawler, and Lawrence Schwartz (2003, Spring). “Fundamentals of Earned-Value Management: Government Projects.” Public Manager 31.1: 37-40.
Stephenson, H. Lance (2004). “Identifying Risks and Opportunities Using EAC.” Transactions of AACE International p CSC.06.01-10.
Suarez, Luis F. and Howard A. Green (1988). "A System for Monitoring Cost and Schedule Performance of Professional Design Services." AACE Transactions , pp. G.7.1G.7.5.
Suhanic, George (1986). "The Cost Control Banana." AACE Transactions ,pp. B.1.1-6.
Sutor, Ray (1993, March). "Impact of Integrated Management System Requirements on Performance Measurement Systems." In Control 6:115-129.
Stratton, Ray (2002, November). "Do The Math." Projects at Work 2:(3 pages).
Stratton, Ray (2002, March). "Moving Around the Project Triangle." The Measurable News. page 12.
Stratton, Ray (2005) “Not Your Father's Earned Value” Projects@Work.
Terry, Mark and Mara Vanderburgh (1993, September). An Analysis of Estimate At Completion Models Utilizing The Defense Acquisition Executive Summary Database . Masters Thesis. Air Force Institute of Technology.
Tomisc, Deborah. (2005, October). "Earned Value: DoD Implements Policy Improvements." Contract Management, p. 30.
Town, Charles (1998). "Project Control and Earned Value Management." Management Accounting: Journal of the Institute of Cost and Works Accountants 76:22-24.
Tkach, Jeffery B (1990, September). An Investigation into the Use of Faces as a Means of Presenting Cost Performance Report Data. Masters Thesis. Air Force Institute of Technology, WrightPatterson AFB, Ohio.
Trufant, Thomas M. and Robert H. Murphy (1990). "Contemporary Planning in the '90s." AACE Transactions, pp. H.3.1H.3.5.
Tuma, David and David R. Webb (2005, March). "Personal Earned Value: Why Projects Using the Team Software Process Consistently Meet Schedule Commitments." CrossTalk 18/3:17-21
Turf, Larry and Marty Fallier (1993, March). "DOE's New Project Control System Guidelines." In Control 6:131-164.
Tyler, Douglas, W (1987, April). "Effective Use of PMS Data." In Control 1:102116.
Valkenhoff, B.H (1981, August). "Cost Performance Measurement." Cost Engineering 23/4.
Vandersluis, Chris. (1995, October 25). "Metric Madness? PM can help measure." Computing Canada 21:33.
Vandevoorde, Stephan and Mario Vanhoucke (2006, July). "A Comparison of Different Project Duration Forecasting Methods Using Earned Value Metrics." International Journal of Project Management 24:289-302.
Vanhoucke Mario, Vandevoorde Stephan (2006, September 13). "A Simulation and Evaluation of Earned Value Metrics to Forecast Project Duration." Journal of the Operational Research Society.
Vanhoucke Mario, Vandevoorde Stephan (2008, Winter) "Measuring the Accuracy of Earned Value/ Earned Schedule Forecasting Predictors." The Measurable News: 26-30.
Varady, Joseph R. Jr. and Mark J. Lumer (1983, July-August). "Taking the Heartburn out of CS2." Program Manager 12:11-12.
Vargas, Ricardo Viana (2003). “Earned Value Analysis in the Control of Projects: Success of Failure?” Transactions of AACE International. p1-1.
Vargas, Ricardo Viana (2004). “Earned Value Probabilistic Forecasting Using Monte Calo Simulation.” Transactions of AACE International. p CSC.13.01-09.
Vargas, Ricardo Viana (2005, May). “Using Earned Value Management Indexes as Team Development Factor and a Compensation Tool.” Cost Engineering 47:20-25.
Wake, Steve (1998). Earned Value Booklet. 3rd Edition. Palmer Green, London: Steve Wake Projects, Limited.
Wall, William C. Jr. and Jule R. Powers (1991, November-December). "It's Time to Change." Program Manager 20:28-34.
Wallender, Timothy J (1987). "HQ Air Force Systems Command Estimate At Completion Formula Justification." In Control 1:919.
Wang, Ching-Hwang, Yu-chun Huang (2000, April). "A New Approach to Calculating Project Cost Variance." International Journal of Project Management18: 131-137.
Warhoe, Stephen P. (2004). “The Basics of Earned Value Management.” Transactions of AACE International p CSC.07.01-11.
Web, David R. (2002, December). "All the Right Behavior." The Measurable News. p. 19
Webb, Alan (2003). Using Earned Value. A Project Manager's Guide. Aldershot (Gower Publishing).
Webster, Anthony (1988, July-August). "C/SCSC Lessons Learned: Theoretical Framework." Program Manager 17:13-22.
Webster, John (2002, November). "Meaningful Metrics." PM Network 16:34-39.
Werderitsch, Anthony (1993). "Light Truck Energy Management Program." AACE Transactions, J.5.
Weger, R. L (1986, October). "The Development of an On Line Management Information System for Cost/Schedule Control." In Control 1:1424.
Whitesides II, James D. (2002). “Craft Curves for Estimating and Project Evaluation.” Transactions of AACE International p 13.1-5
Whittenberg, Ira O (1972, Fall). "Potential Benefits and Problems Related to Contractor Compliance With DoDI 7000.2 (C/SCSC)." National Contract Management Journal 6:73-80.
Willoughby, Thomas J (March-April 1995). "Managing design under lump-sum contract." Journal of Management in Engineering 11:21-26.
Wilson, Brian D (1992). "An Analysis of Contract Cost Overruns and Their Impacts." Masters thesis. Wright Patterson AFB, OH: Air Force Institute of Technology (AFIT/GCA/LSY/92S-8).
Yu, Kelvin (1996). "Project Controls: Cost/Schedule/Progress Management on the NASA Wind Tunnel Restoration Project." Cost Engineering 38/4: 25-32.
Zink, Dwight A (1980). "Monitoring the Adequacy of the Amount and Productivity of Engineering and Construction Manpower." AACE Transactions, C.B.
Zwikael, Ofer, Shlomo Globerson, and Tzvi Raz. "Evaluation of Models for
Forecasting the Final Cost of a Project." Project Management Journal31
:53-57.
Page maintained by David Christensen
Last updated 13 Apr 2008